Maintenance & Project Plan

Deferred Maintenance:

2013

  • Replace Electronic Member Gate: Complete
  • Replace Clubhouse Roof: Acquiring Bids
  • Sweep Front Bays with Magnets for Steel / Scrap: Complete
  • Cut Up and Dispose of Damaged Steel Table: Complete
  • Replace Flood Damaged Safe and Bay Table Tops

Projects Plan:

2013
  • Install Permanent Bay Covers Bays 1-5: Complete
  • Install Plate Rack in Bay 2 for Member Use: Complete
  • Contractor Bids to Permit & Add Additional Bay(s): Design Definitized

Contingency Repairs:

- Berm Height Restoration & Planting

- Add Gravel to Bays and Roads

 Long Term Plan Estimate: 

 - Add Additional Bay(s)

- Cut Right Oblique Gravel Road from Front Gate to Pole Barn

- Pole Barn Circular Drive 

- Elec Svc to Bays 1-5

The Proponent of this Plan is the ACC Treasurer